Homepage ›› Companies ›› Sefa Erbag - Erbag Construction ›› sheathing

Sefa Erbag - Erbag Construction

Adres: 253. CADDE (ESKİ 17) 4

Tel 1: 0 (312) 385 08-06

Faks:

Email 1: sefaerbag@gmail.com

Email 2: erbaginsaat@gmail.com

Web: www.erbagyapi.com

Sheathing

Sheathing

The application we call sheathing is the thermal insulation application that can be made inside and outside the building in order to prevent the formation of thermal bridges and to ensure the continuity of the insulation. Exterior jacketing is the most suitable thermal insulation system in terms of building physics. Sheathing is the covering of the outer shell of the building with thermal insulation materials (EPS, Rockwool, XPS) in order to prevent heat losses and gains according to seasonal conditions.

ADVANTAGES OF INSULATION

It prevents the formation of thermal bridges by completely isolating all kinds of reinforced concrete structural elements such as beams, columns, beams, etc. on the exterior of the building.

It wraps the building from the outside like a mantle and prevents cracks and damages that may occur in the main material due to temperature differences. Summer and winter temperature differences on the outer walls can reach up to 5 degrees.

Building exterior walls are protected from all effects of the external environment.

Provides both heat and water insulation

Up to 50% heat savings can be achieved with a sheathing application made in accordance with the technique. Especially in applications made with rockwool, great heat and energy savings can be achieved.

It extends the life of the building by protecting the reinforcements inside the concrete on the exterior walls of the building against corrosion.

WHERE SHEATHING IS MADE

Sheathing can be applied to the exterior walls, roofs, soil-contact areas of the buildings, the floors separating the floors, the parts facing the unheated parts such as the warehouse and garage, and the cold storages. In short, wherever you want..

HOW LONG DOES THE COATTING WORK?

Sheathing application takes an average of 1-4 weeks for a medium-sized building. Weather conditions, the size of the building, the number of personnel to work in the application can affect this period positively or negatively. Sheathing should not be applied in strong wind, fog or rainy weather conditions. The most ideal time is the period when the external surface to be applied and the ambient temperature are at least +5 degrees.

Get Info
İnşaat Malzemeleri İmalat ve Satış